Comissioning, preparation and planning Lake Bloom phase 2

project outline

Phase II of Cliffs Natural Resources’ iron ore extraction project at Lac Bloom, near Fairmount, planned to double annual iron concentrate production at the site to 16 millions tons.

The project required investment of around 650 millions dollars. Groupe Alphard were contracted to manage the collected commissioning documentation for the mechanical equipment, instruments and “low-power” electrical equipment installed. Our professionals also oversaw monitoring of the commissioning schedule.

Client

CLIFFS NATURAL RESOURCES

Location

QUÉBEC (CANADA)

period

2012

services provided


  • Commisioning preparation and planning
  • Production of verification documentation
  • Pre-operational verifications and pre-operational tests (POV and POT)
  • On-site data capture during POV and POT