Construction of a contaminated soils landfill
project outline
The project is located on the Biogénie site at L’Épiphanie. The project involved the construction of cell no. 1, leachate treatment ponds, visual screens and other related works. Cell no. 1 covers an area of approximately 55,000 m2 and includes a double-level waterproofing system at a maximum depth of approximately 10 m in the natural clay deposit.
Client
Biogénie (Englobe Corp Division)
Location
L’Épiphanie, Québec
period
2012-2013
services provided
- Revision of preconstruction documentation;
- Ensure compliance with workplace health and safety requirements;
- Prepare and lead the works kick-off meeting;
- Produce daily and weekly works progress reports;
- Provide technical advice during construction related to the interpretation of plans and specifications;
- Modify construction plans as required;
- Verify and approve shop drawings, supplier drawings, site samples and technical sheets;
- Implement a detailed testing program to ensure works conformity;
- Lead site meetings;
- Supervision of contractor works;
- Coordination of works activities and monitoring of works schedules;
- Communication between project actors and stakeholders;
- Site surveying, verification of quantities and materials;
- Recommendations regarding contractor payment requests;
- Preparation of the list of non-conformities and of preliminary works acceptance documentation;
- Quality assurance during works;
- Verification of laboratory testing of natural and geosynthetic materials;
- Electrical leak location on geomembrane;
- Preparation of the works acceptance report